FACADE RESTORATION
Kips Bay Complex
New York, NY

SCOPE OF WORK
- ▸8 Structures
- ▸Complete Slab Edge Restoration
- ▸100 % Window Caulk Replacement
- ▸100 % Bed Joint & Head Joint Replacement
- ▸Parapet Concrete Repairs
- ▸Back-Up Wall Flashing Replacement (PMMA)
- ▸100% Balcony Repair and Terapro 220 Application
- ▸100% Emseal Replacement (3000 LF)
PROJECT METRICS
| 48 Suspended Scaffolds Simultaneously Operating |
| 144 Suspended Scaffolds Total |
| Full-time On-Site Site Safety Coordinator |
| 80,000 LF of Sealant/Caulk Replacement |
| 10,000 Custom Corner Bricks Replaced |
| 20,000 Sq Ft of Pointing |
| 460 Balconies Repairs and Waterproofed |
| 3000 LF Emseal Replacement |
Project Overview
Kips Bay Complex is a facade restoration project completed by Royce CM in New York, NY.
Scope of Work
- 8 Structures
- Complete Slab Edge Restoration
- 100 % Window Caulk Replacement
- 100 % Bed Joint & Head Joint Replacement
- Parapet Concrete Repairs
- Back-Up Wall Flashing Replacement (PMMA)
- 100% Balcony Repair and Terapro 220 Application
- 100% Emseal Replacement (3000 LF)
Project Metrics
- 48 Suspended Scaffolds Simultaneously Operating
- 144 Suspended Scaffolds Total
- Full-time On-Site Site Safety Coordinator
- 80,000 LF of Sealant/Caulk Replacement
- 10,000 Custom Corner Bricks Replaced
- 20,000 Sq Ft of Pointing
- 460 Balconies Repairs and Waterproofed
- 3000 LF Emseal Replacement
Project scope and metrics above are self-reported by Royce CM based on internal project records.